A radon system is not finished when the fan turns on. It is finished when a test shows the house is below the EPA action level of 4.0 pCi/L. That clearance test is what buyers, sellers and lenders ask for, and it is how you know the money you spent actually worked. Here is what to expect from the day the system goes in to the day you file the report.
The Timeline at a Glance
| When | What happens |
|---|---|
| Install day | System installed, sealed, labeled; manometer marked |
| At least 24 hours later | Sub-slab vacuum has stabilized; test can begin |
| 12 hours before the test | Closed-house conditions start |
| 48 hours minimum | Continuous monitor logs hourly readings |
| Within 30 days of install | Clearance test completed |
| Every two years after | Routine retest |
Before the Test: What You Do
Very little. Keep windows and exterior doors closed for 12 hours before and throughout the test, except for normal coming and going. Do not run whole-house fans or wood fireplaces. Your furnace and central air run normally.
One practical tip for Altoona homeowners: if a major storm front or high winds are forecast, it is worth asking whether to shift the start by a day. Sharp barometric drops can temporarily pull more soil gas indoors.
Where the Monitor Goes
The device should sit on the lowest livable level, ideally in the same spot as the original test. That apples-to-apples placement is what lets you calculate a real reduction percentage. It sits 20 inches or more off the floor and away from the sump, bathrooms, laundry areas and exterior walls.
Installer or Independent Tester?
Both are legitimate when the tester holds an Iowa HHS measurement credential.
- Installer testing is usually faster to schedule because the team already knows the house.
- Independent testing is preferred by some real estate agents and lenders because it removes any perceived conflict of interest.
Radon Systems of Iowa includes an independent post-mitigation test with every installation, so homeowners and buyers get third-party verification by default.
Reading Your Result
| Result | What it means |
|---|---|
| Below 1.0 pCi/L | Excellent; strong safety margin for winter |
| 1.0 to 1.9 | Very good; below both EPA and WHO thresholds |
| 2.0 to 3.9 | Passes the action level, but there may be room to improve |
| 4.0 or higher | Fails; system needs adjustment |
To see your reduction, divide the drop by the starting number. A house that went from 9.0 to 0.9 pCi/L achieved a 90 percent reduction, a common outcome on Polk County basements where averages run around 7.3 to 9.2. For more on realistic outcomes, see how well systems work.
Keep your report
File the clearance report with your system paperwork. You will want it for a future sale, for any service questions and to compare against later retests.
If the Test Fails
A high clearance result means suction is not reaching some part of the foundation, or air is leaking into the system. The usual causes:
- A slab section that is not connected to the main slab, such as an addition or split level.
- A sump lid that is unsealed or was removed.
- An open crawlspace area that was not encapsulated.
- A fan that is undersized for tight glacial-till soil.
- A large crack or open block-wall core that was missed.
The fix is diagnosis first, then the targeted adjustment, then a repeat test under the same conditions. Our installations come with a results guarantee: the system has to test below the EPA action level.
After You Pass
- Monthly: check that the manometer liquid is still uneven and near the install mark.
- Every two years: retest. See how often to test for radon.
- After big changes: retest after finishing the basement, replacing the furnace or adding interior drain tile.
Never Had a Clearance Test?
If a previous owner or another company installed your system and you have no clearance report, it is not too late. A professional test now tells you where the system stands. Book post-mitigation testing with our Altoona team, available seven days a week.
